Established. A factory was built in HAMAMATSU. |
Started processing pipes, designing and making molds. |
|
A main factory was built in HAMAMATSU. |
Started welding for two-wheeled vehicle frames. |
|
Introduced a NC bender to expand our operations. |
Established management structure to rationalize our Management department. |
|
A factory was built in Kakegawa. |
Strengthened welding processing by introducing robotic arc welding. |
|
With the growth of demand on small lot, started plasma arc machining and gained a good reputation among the industry. |
|
A building was additionally built inside the main factory to expand our operations. |
Strengthed the capacity of Mold department by introducing MCs, NC lathes and NC fraises. |
With those, achieved to establish the throughout-production-system. |
Introduced 3 dimensional CAD/CAM to shorten a lot of time for designing to make higher quality products. |
Introduced special purpose machines and automatic lines, and started producing mafflers of two-wheeled vehicles. |
|
A building was additionally built inside the KAKEGAWA factory. |
Newly installed lines of robotic arc welding to expand our operations. |
|
Successed to reduce cost by improving the porduction efficiency with index table and establishing the two-torching system on robotic arc welding. |
|
A building was additionally built inside the main factory. |
|
Introduced a 300t press and started processing round pipes. |
|
Started aluminium TIG welding. |
|
Started aluminium MIG welding. |
|
Started business with YMMC(USA, Atlanta). |
|
Established MIPP, Mitsuba Indonesia. |
|
The 2nd building was additionally built inside the facotry of MIPP, Mitsuba |
|
The 3rd building was additionally built inside the facotry of MIPP, Mitsuba Indonesia. |
|
The 4th building was additionally built inside the facotry of MIPP, Mitsuba Indonesia. |
|
Started painting (EDP and SPRAY) MIPP, Mitsuba Indonesia. |